Why Westover calls Interior Image MD
Open farmland means wind hits Westover roofs and siding hard. We build exteriors to hold up in it and can usually get out to look at storm damage the same week.
What flooring installation includes for country homes, manufactured homes and farm buildings
Floors fail from underneath. We check the subfloor, fix joists and squeaks, roll proper underlayment, then run plank so the seams fall where you don't look.
- LVP, laminate, hardwood and tile
- Subfloor leveling, joist repair, squeak fixes
- Underlayment and moisture barrier
- Transitions, quarter round and shoe molding
- Furniture moved out and put back by us
Most single-level installs finish in 2–4 days.
Neighborhoods we cover
- Route 13
- Kingston area
- Route 413 toward Crisfield
ZIP 21871 · Open 7 days a week, 7 AM – 6 PM
