Why Princess Anne calls Interior Image MD
A lot of Princess Anne houses are older frame homes with original floors, crawl spaces and plaster that don't forgive shortcuts. Rental turnover near UMES keeps us busy too — landlords like that one crew can handle paint, floors, plumbing and debris in the same visit.
What bathroom remodeling includes for older frame homes, farmhouses and student rentals
Bathrooms are where shortcuts hide. Ours get waterproofed shower assemblies, blocking behind every grab point, and tile clipped level course by course before a single fixture goes in.
- Full gut to the studs, rot and old plumbing removed
- Waterproofed shower walls and pans
- Large-format and mosaic tile, niches built in
- Vanities, mirrors, fixtures and exhaust venting
- Final clean so the room is usable the day we leave
A typical full bathroom is 10–14 working days.
Neighborhoods we cover
- Downtown & Somerset Ave
- UMES area
- Venton Rd
- Mt Vernon Rd corridor
ZIP 21853 · Open 7 days a week, 7 AM – 6 PM
